Toll Road

Project Detail

Balikpapan – Samarinda

Project Schedule: 2010 – 2019

This is the first toll road in the island of Kalimantan, which has 5 sections and length of 99.32 km to connect the city of Balikpapan and Samarinda. The existence of this toll road is projected to shorten the travel time between the two cities that currently takes up to 3 hours, to become 1 hour only.

 

Manado – Bitung

Project Schedule: 2017 – 2019

This is the toll road in North Sulawesi region, with a length of 39 km to connect Manado with Bitung region. This toll road is built to speed up the travel time between the two regions, as it has become too dense and difficult to get through.